Turning On the Power of This Machine

This machine has two power switches, namely, main power switch and sub power switch.

  1. Turn ON the main power switch.

    The main power switch is located inside the machine and can be reached from the front door.

    With the main power switch turned on, the Power LED on the control panel lights up in orange.

    NOTICE
    • The main power switch should normally be kept turned on. Be sure not to turn it off/on in usual operation.

  2. Turn ON the sub power switch.

    The sub power switch is located on the top-right surface of the main body.

    With the sub power switch turned on, the power LED on the control panel turns blue.

  3. The Wake-up screen and Warm-up screen are displayed.

    The Wake-up screen is displayed, followed by the MACHINE screen with warm-up indications.

    The warm up takes approximately 6.5 minutes.

    • supplementary explanationPressing the COPY tab on the screen during warm-up displays the COPY screen. When the message Ready to set reserve job appears on the COPY screen, you can set reserve jobs and scan originals while the machine is warming up so that the machine starts printing immediately after warm-up is completed. For details, refer to Reserving Copy Jobs during Warm-up.

  4. The message Ready to print appears on the screen to inform you that the machine can now print jobs.

    • supplementary explanationIf a key counter or copy card is required, follow the instructions on the screen.